Design of energy centres

Customer Projects
Oil and Gas Research and Design Institute "Neftegazproekt" LLC LUKOIL-West Siberia LLC
  • Pyakyakhinskoye oilfield construction with land plot allocation for pilot oil production. Start-up Complex 1. Energy Complex. Installation of 2 additional power units "Ural-6000" No.5, No.6 with 10 kV closed switchgear replacement based on 6 MW Gas Turbine Plant (GTP) by Aviadvigatel JSC (total power - 24 MW)


  • Oil and Gas Research and Design Institute "Neftegazproekt" LLC
  • Kogalymneftegaz Business Unit GTES-28 (Gas Turbine Power Plant) of Vostochno-Perevalnoye field based on 4 MW and 6 MW GTP by Aviadvigatel JSC (total power - 28 MW)


  • North Ural Industrial Group LLC (Energyresource LLC Perm)
  • Detail Documentation development with state expert review: Installation of two Guascor Gas Engine Power Plants (SFGM 560) in water boiler house at Energyresource LLC (total power – 2000 kW)


  • Iskra-Energetika CSC
  • Energy Centre No.2 of Central Khoreyver Uplift CPF, block 1, 2, 3, 4 based on 12 MW GTP by Aviadvigatel JSC (total power - 72 MW)


  • Siberia-Engineering LLC (Krasnoyarsk)
  • Kharampurskoye gas field construction. Senomanian and Turonian deposits development. Power Generation Package


  • PermTOTIneft LLC (Osa)
  • Project and Detail Documentation development: Technical retrofitting of APG Recycling Unit at “Garyushki” Preliminary Water Removal Unit, Garyushkinskoye oilfield, based on Capstone C-200 microturbines




  • 4 GTPP "Ural-6000" Yamalneftegaz Business Unit
    Equipment - GTPP "Ural-6000" manufactured by Aviadvigatel JSC
    Total power - 24 MW (2 additional energy units No.5 and No.6)
    Customer - Oil and Gas Research and Design Institute "Neftegazproekt"
    Location – Tyumen Region,Yamalo-Nenets Autonomous Okrug, Tazovsky District, Pyakyakhinskoe field


    Guascor Gas Engine Power Plants
    Equipment – Guascor SFGM 560
    Total power – 2000 kW
    Customer – Energyresource LLC
    Location – Perm Krai, Perm, Federal State Unitary Enterprise "Machine Building Plant named after F.E. Dzerzhinsky"


    Energy Centre No.2 SK RUSVIETPETRO LLC
    Equipment – EGES-12S Power Unit based on GTU-12 PG-2 Gas Turbine by Aviadvigatel JSC
    Total power – 36 MW
    Customer – SK RUSVIETPETRO LLC
    Location – Arkhangelsk Region, Central Khoreyver Uplift, Nenets Autonomous Okrug