Design of low-voltage and high-voltage power supply systems (up to 110 kV inclusive)

Customer Projects
LUKOIL-ENERGOSETI LLC
  • Cost Estimate and Detail Documentation development with state expert review: 35 kV closed switchgear retrofitting, TsRP-1 (Central Distribution Substation)
  • Detail Documentation development: LUKOIL-PNGP-2013 Upgrading, 0.4 kV RP (Distribution Substation) replacement , bld.121
  • Detail Documentation development: ARIS SCADA system repair, LULOIL-PNOS (Substation Complex: TsRP-1,2,3,4,5,6,7; KP-1,2,3А,4)


  • Tyazhpromelektromet CJSC RITEK JSC
  • Detail Documentation development: 110/35/6kV "Gezhskaya" Substation retrofitting
  • Detail Documentation development: 35/6kV "Troelga" Substation retrofitting


  • Azot Branch of URALCHEM JSC
  • Project Documentation development: Substation No. 62 retrofitting with electrical equipment replacement


  • Belkamneft JSC
  • Project Documentation development: Chernovskoye oilfield. 110/35/6kV "Chernushka" Substation retrofitting
  • Detail Documentation: Arlanskoye oilfield Vyatskaya area construction. 1st stage. 110/35/6kV "Sukharevo-BKN" Substation retrofitting. Upgrade.


  • Sibur-KhimpromCJSC
  • Detail Documentation development with state expert review: Switching equipment and switchgear No. 9 relay protection retrofitting; Control room lighting (bld. 702) at product and raw material storage facility; Pump station lighting (bld. 702) at product and raw material storage facility; Pump station lighting (bld. 713) at product and raw material storage facility
  • Detail Documentation development: Replacement of power supply for TP-2 consumers (bld. 31) with power supply from TP-6Т-3 bld.201/6 and TP-7 bld.40
  • Detail Documentation development: Replacement of power supply for TP-11 consumers (bld. 563/3) with power supply from TP-42 bld.563/6
  • Detail Documentation development: Oil facilities integration, cable rack revamp (from TP-34 bld.754 to 0.4 kV RP bld.756). 0.4 kV RP power supply (bld.756). Cable rack transfer near bld.757 from RP-7 to TP-34, 6 kV cable line transfer (from GTES-4 to RP-5 (6 kV Switchgear)) into 2nd row cable rack
  • Detail Documentation development: RP-13 switching equipment and relay protection retrofitting
  • Detail Documentation development: Power supply of 2-Ethylhexanol Unit, bld.352/1
  • Detail Documentation development: Power supply of TP-28 consumers, bld.42/1; Power supply of Steam Production Unit No.2, bld.332
  • Detail Documentation development: Lighting network replacement in PBS&2EH Section of industrial farms


  • Kazanorgsintez PJSC
  • 6 kV switchgear revamp, RP-37
  • Operating DC Voltage System revamp, TsRP-4


  • Tyazhpromelektroproekt-Perm LLC
  • Cost Estimate and Detail Documentation development with state expert review: 35 kV closed switchgear retrofitting, TsRP-1 (Central Distribution Substation) LUKOIL-Permneftrorgsintez LLC


  • MTK Business. Optima CJSC
  • Detail Documentation development with safety expert review: Monitoring system implementation for partial discharges in high-voltage electric motor windings, Sibur-Khimprom CJSC
  • Detail Documentation development with state expert review: Implementation of stator winding insulation control system with partial discharge method PDTrac IRIS Power powered by 4АZMP-1000/6000 UKHL4 (item No.А-401) electric motor in bld.207/7, Ethylene and Propylene Production


  • Uralenergoservis LLC
  • Detail Documentation development with safety expert review: Cable line replacement, Hexanoic Acid Unit, bld.374a, Butyl Alcohols and 2-Ethylhexanol Production. Internal electrical power networks, bld. 374а External electrical power networks, bld. 374а


  • Pashiyskiy Metallurgical Cement Plant OJSC (Pashiya)
  • Detail Documentation development: Equipment power supply in swarf clogging area, ore division


  • ENERGOSERVIS JSC
  • Detail Documentation development: Trifon Vyatskiy’s sacred spring complex power supply