Customer Projects
Belkamneft PJSC (Izhevsk)
  • Detail Documentation development: Preliminary Water Removal Unit updating at “Vyatka” production facilities. Process liquid supply area retrofitting in the Udmurt Republic.


  • LUKOIL-Permnefteorgsintez LLC
  • Cost Estimate and Detail Documentation development within the investment project "Program of measures on elimination of industrial safety and labour protection breaches 2015-2020" for the following facilities:
    – Equipping of process facility at Catalyst Regeneration and Hydrodearomatisation Unit of Deep Conversion Refinery with control and warning devices due to presence of explosion and fire hazardous and toxic substances in water cooling system at the header outlet
    – Equipping of process facility at Feedstock Treatment Unit (Unit No.545) of Deep Conversion Refinery with control and warning devices due to presence of explosion and fire hazardous and toxic substances in water cooling system at the header outlet
    – Equipping of process facility at Hydrogen Production Unit of Deep Conversion Refinery with control and warning devices due to presence of explosion and fire hazardous and toxic substances in water cooling system at the header outlet
    – Equipping of process facility at MEA Regeneration Unit and Sour Water Stripper of Deep Conversion Refinery with control and warning devices due to presence of explosion and fire hazardous and toxic substances in water cooling system at the header outlet
    – Equipping of process facilities of Deep Conversion Refinery with control and warning devices due to presence of explosion and fire hazardous and toxic substances in water cooling system at the header outlet from Hydrocracking Unit (Unit No. 510)
    – Equipping with control and warning devices due to presence of explosion and fire hazardous and toxic substances in water cooling system at the header outlet from Delayed Coker Unit 21-10/ZM


  • Sibur-Khimprom CJSC
  • Detail Documentation development: Installation of closed utilities system for residue removal from pipelines, pumps and pump station bld. 201/14, Ethylene and Propylene Production, Sibur-Khimprom CJSC
  • Detail Documentation development: Reduction of heat energy loss with E-301 deaerator steam
  • Detail Documentation development: Installation of automatic level control devices and HH level trip for Е-1÷Е-12 overflow prevention in intermediate tank farm, Pyrolysis Section, Ethylene and Propylene Production, Sibur-Khimprom CJSC
  • Detail Documentation development: Replacement of pumps N263/1,2
  • Detail Documentation development: Technical retrofitting of Fuel Gas Preparation Unit for boilers and external interconnecting off-gas and fuel gas pipelines
  • Detail Documentation development: Design of steam supply from P-15/2, P-15/3 to GFU-2 (Gas Plant) bld.122, Ethylene and Propylene Production, and condensate return to the networks
  • Detail Documentation development: Installation of closed utilities system for residue removal from pipelines, pumps and pump station bld. 201/14, Ethylene and Propylene Production, Sibur-Khimprom CJSC
  • Detail Documentation development: Replacement of pumps N-411/1,2, Ethylene and Propylene Production
  • Detail Documentation development: Separation of dry gas relief into fuel network and flare system after unloading of rail tankers during their drainage
  • Detail Documentation development: Scheme change of heating water supply to Expanded Polystyrene Production Unit
  • Detail Documentation development: H-713 pump replacement with another model


  • Kazanorgsintez PJSC (Kazan)
  • Cost Estimate and Detail Documentation development: Boiler house retrofitting at "Lebyazhie" guest house with state expert review and expert report registration in Rostekhnadzor Privolzhsky Authority.


  • PermTOTIneft LLC (Osa)
  • Project and Detail Documentation development: APG Recycling Unit retrofitting at "Garyushki" Preliminary Water Removal Unit, Garyushkinskoye oilfield, based on Capstone C-200 microturbines


  • Oil and Gas Research and Design Institute of Ukhta State Technical University LLC (Ukhta)
  • Project Documentation: Kharyaga oilfield construction
  • Project and Detail Documentation: Toboyskoe oilfield power supply from GTPP
  • Project and Detail Documentation: Myadseyskoye oilfield power supply from Gas Engine Power Plant (GEPP)


  • RosEnergoHolding LLC (Moscow)
  • Scope of work: Construction of gas production, treatment, liquefaction, LNG and gas condensate shipment complex, Yuzhno-Tambeyskoye gas field. Gas well clusters


  • Pashiyskiy Metallurgical Cement Plant OJSC (Pashiya)
  • Detail Documentation development: Gas pipeline design for 4 MW and 0.5 MW gas modular boiler houses
  • Detail Documentation development: Gas pipeline design for "Hoper" 100 kW gas boiler houses